Infrastructure activity · Calgary

Infrastructure construction projects in Calgary

A source-linked view of Calgary records classified as infrastructure rather than a private building project.

Live matches 61 infrastructure projects in the current database
Evidence Official links Every listed project points back to its public source
Freshness Checked every morning Latest change in the projects shown: Nov 10, 2026
What this page tracks

What qualifies as infrastructure here

This category covers records whose description supports infrastructure-oriented work. It is narrower than the full universe of municipal capital projects because coverage is limited to the permit and planning sources currently monitored.

A missing project does not mean no infrastructure work exists. It may live in a tender, capital-plan or agency dataset that has not yet been added to Construction Brief.

Live Calgary records

Projects matching this view

Results are generated from the same database as the main project search. Verify the linked public record before outreach.

Worth watching $14.4M

New utility building

683 9 AV SE

Infrastructure Estimated stage · Building permit issued

Applicant (architect/owner): AECOM

Why now · Interpretation

First detected Jul 29. The building permit is issued; verify mobilization and any unawarded scope quickly.

Estimated sales window Construction procurement
Now to approximately 2 months
Worth watching $28.3M

Interior/Exterior Alterations

11425 ANDERSON STATION WY SW

Infrastructure Estimated stage · Building permit issued

General contractor: GRAHAM CONSTRUCTION AND ENGINEERING LP

Why now · Interpretation

First detected Jul 29. The building permit is issued; verify mobilization and any unawarded scope quickly.

Estimated sales window Construction procurement
Now to approximately 2 months
General activity Earliest signal Value not disclosed

Revision: outdoor recreation area (retaining walls)

9600 COUNTRY HILLS BV NW

Infrastructure Estimated stage · Development application

Applicant (architect/owner): GEC ARCHITECTURE

Why now · Interpretation

First detected Jul 29. A development application is active, when design-team and specification outreach may still be timely.

Estimated sales window Specification
Approximately 1 to 4 months
General activity Earliest signal Value not disclosed

New excavation stripping and grading

7200 50 AV SE

Infrastructure Estimated stage · Development application

Applicant (architect/owner): EXP SERVICES

Why now · Interpretation

First detected Jul 29. A development application is active, when design-team and specification outreach may still be timely.

Estimated sales window Specification
Approximately 1 to 4 months
General activity Earliest signal Value not disclosed

Temporary use: excavation, stripping and grading (6 years)

22000 SHERIFF KING ST SW

Infrastructure Estimated stage · Development application

Applicant (architect/owner): PASQUINI AND ASSOCIATES CONSULTING

Why now · Interpretation

First detected Jul 29. A development application is active, when design-team and specification outreach may still be timely.

Estimated sales window Specification
Approximately 1 to 4 months
General activity Earliest signal Value not disclosed

Excavation stripping and grading

57 ELVEDEN DR SW

Infrastructure Estimated stage · Development application

Applicant (architect/owner): SCHEFFER ANDREW

Why now · Interpretation

First detected Jul 29. A development application is active, when design-team and specification outreach may still be timely.

Estimated sales window Specification
Approximately 1 to 4 months
General activity Earliest signal Value not disclosed

Temporary use: excavation, stripping and grading

2202 128 AV NE

Infrastructure Estimated stage · Development application

Applicant (architect/owner): PASQUINI AND ASSOCIATES CONSULTING

Why now · Interpretation

First detected Jul 29. A development application is active, when design-team and specification outreach may still be timely.

Estimated sales window Specification
Approximately 1 to 4 months
View all 61 matches with advanced filters →
Before you use the data

Questions about this view

Is this a complete list of Calgary infrastructure work?

No. It covers infrastructure-classified records in monitored sources, not every capital plan, utility program or tendering authority.

Are bid deadlines included?

Not unless a monitored source explicitly provides them. Permit milestones and bid deadlines are different facts and should not be conflated.

Source-first construction intelligence

Search every Calgary project field in one place.

Use advanced filters